Ashe Plantation Lift Station
Open
Bonfire
Summary
The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.
Details
| Solicitation Number | FY27-ITBCON-31 |
| Type | ITB |
| Posted | 2026-10-15 4:00PM EDT (25 days ago) |
| Response Deadline | 2026-11-12 2:00PM EST (in 2 days) |
| State | NC |
Description
The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.
Contact
| Name | Bridgette Maxie |
| Email / phone | 🔒 Available with Pro Upgrade |