Ashe Plantation Lift Station

Agency: City of Charlotte Solicitation #: FY27-ITBCON-31 Due: 2026-11-12 2:00PM EST (in 2 days)
Open Bonfire

Summary

The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

Details

Solicitation NumberFY27-ITBCON-31
TypeITB
Posted2026-10-15 4:00PM EDT (25 days ago)
Response Deadline2026-11-12 2:00PM EST (in 2 days)
StateNC

Description

The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

Contact

NameBridgette Maxie
Email / phone 🔒 Available with Pro Upgrade