CMPD Steele Creek EV Charger Additions
Open
Bonfire
Summary
Installation of four Dual Port Level II, 80 amp EV chargers and all required power distribution equipment as required to serve the chargers. In addition, the city will provide provisions for five future Level II chargers including conduits and circuit breakers for the future circuits to feed these chargers. The scope also includes adding one 200 KW DC fast charger and required electrical. All other equipment is existing to remain. Chargers are owner provided and contractor installed.
Details
| Solicitation Number | 269-2027-030 |
| Type | ITB |
| Posted | 2026-10-15 2:30PM EDT (25 days ago) |
| Response Deadline | 2026-11-12 1:00PM EST (in 2 days) |
| State | NC |
Description
Installation of four Dual Port Level II, 80 amp EV chargers and all required power distribution equipment as required to serve the chargers. In addition, the city will provide provisions for five future Level II chargers including conduits and circuit breakers for the future circuits to feed these chargers. The scope also includes adding one 200 KW DC fast charger and required electrical. All other equipment is existing to remain. Chargers are owner provided and contractor installed.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ Blank Mutual NDA.pdf DocumentationNDA that must be signed and emailed to gain project documents.