A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina
Summary
The City of Key West is asking for bids from qualified marine contractors to fully replace A-Dock and replace the decking on D-Dock at the Key West Bight Marina. On A-Dock, the existing timber dock comes out completely and is rebuilt. That covers piles, pile caps, cross-bracing, stringers and decking, plus new electrical, potable water, sewer pump-out and fire protection systems and new dock accessories. On D-Dock, the existing composite decking is removed and replaced with IPE hardwood decking. All new hardware and fasteners are 316 stainless steel. The contractor provides all labor, materials, equipment, permits and incidentals needed for a complete and working installation. The work must follow the construction documents prepared by Tetra Tech and the existing FDEP and USACE permits (USACE SAJ-2021-00839).
MANDATORY A Mandatory pre-bid meeting will be held in the City Managers Conference Room, 1300 White Street, Key West, Florida on October 22, 2026, at 11:00 AM or attendees can join via the TEAMS link below. An option site walk will conclude after the meeting. The City of Key West reserves the right to accept any bid deemed to be in the best interest of the City or to waive any irregularity in any submittal. The City may reject any or all bids and re-advertise. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/259654527832890?p=MVLAnTWJy8Fubjtf66 Meeting ID: 259 654 527 832 890 Passcode: QD3jo6B3
Details
| Solicitation Number | ITB-ITB 26-021-0-2026/LT |
| Type | ITB |
| Posted | 2026-10-15 8:14AM EDT (26 days ago) |
| Response Deadline | 2026-11-16 3:30PM EST (in 5 days) |
| City | Key West |
| State | FL |
Description
The City of Key West is asking for bids from qualified marine contractors to fully replace A-Dock and replace the decking on D-Dock at the Key West Bight Marina. On A-Dock, the existing timber dock comes out completely and is rebuilt. That covers piles, pile caps, cross-bracing, stringers and decking, plus new electrical, potable water, sewer pump-out and fire protection systems and new dock accessories. On D-Dock, the existing composite decking is removed and replaced with IPE hardwood decking. All new hardware and fasteners are 316 stainless steel. The contractor provides all labor, materials, equipment, permits and incidentals needed for a complete and working installation. The work must follow the construction documents prepared by Tetra Tech and the existing FDEP and USACE permits (USACE SAJ-2021-00839).
MANDATORY A Mandatory pre-bid meeting will be held in the City Managers Conference Room, 1300 White Street, Key West, Florida on October 22, 2026, at 11:00 AM or attendees can join via the TEAMS link below. An option site walk will conclude after the meeting. The City of Key West reserves the right to accept any bid deemed to be in the best interest of the City or to waive any irregularity in any submittal. The City may reject any or all bids and re-advertise. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/259654527832890?p=MVLAnTWJy8Fubjtf66 Meeting ID: 259 654 527 832 890 Passcode: QD3jo6B3
Contact
| Email / phone | 🔒 Available with Pro Upgrade |