Heron Parkway Drainage Improvements PW1903

Agency: The Village of Royal Palm Beach Location: Royal Palm Beach, FL Solicitation #: ITB-2027-03-0-2026/JD Due: 2026-11-10 3:00PM EST (in 17 hours)
Active Demandstar

Summary

The project consists of remove and replace existing 21" RCP storm drain with 24" x 38" oval RCP and two (2) inlet structures to include all materials, equipment, labor, , restoration, and maintenance of traffic (including temporary tum arounds and detour), clearing & grubbing, erosion control measures, construction dewatering, excavation, fill, compaction, drainage, curb, gutter, pavement restoration, site restoration, testing, and ancillary improvements as well as compliance with the associated specifications and local ordinances (requirement for placement in the dry and noise ordinances will result in dewatering and a muffler on the dewatering pump). NON-MANDATORY Please join my meeting from your computer, tablet or smartphone. https://meet.goto.com/chrismarshspersonalroom You can also dial in using your phone. United States: +1 (646) 749-3122 Access Code: 936-255-237 Join from a video-conferencing room or system. Dial in or type: 67.217.95.2 or inroomlink.goto.com Meeting ID: 936 255 237 Or dial directly: 936255237@67.217.95.2 or 67.217.95.2##936255237

Details

Solicitation NumberITB-2027-03-0-2026/JD
TypeITB
Posted2026-10-15 3:27PM EDT (25 days ago)
Response Deadline2026-11-10 3:00PM EST (in 17 hours)
CityRoyal Palm Beach
StateFL

Description

The project consists of remove and replace existing 21" RCP storm drain with 24" x 38" oval RCP and two (2) inlet structures to include all materials, equipment, labor, , restoration, and maintenance of traffic (including temporary tum arounds and detour), clearing & grubbing, erosion control measures, construction dewatering, excavation, fill, compaction, drainage, curb, gutter, pavement restoration, site restoration, testing, and ancillary improvements as well as compliance with the associated specifications and local ordinances (requirement for placement in the dry and noise ordinances will result in dewatering and a muffler on the dewatering pump). NON-MANDATORY Please join my meeting from your computer, tablet or smartphone. https://meet.goto.com/chrismarshspersonalroom You can also dial in using your phone. United States: +1 (646) 749-3122 Access Code: 936-255-237 Join from a video-conferencing room or system. Dial in or type: 67.217.95.2 or inroomlink.goto.com Meeting ID: 936 255 237 Or dial directly: 936255237@67.217.95.2 or 67.217.95.2##936255237

Contact

Email / phone 🔒 Available with Pro Upgrade