East Marginal Way S Preservation (FHWA)
Summary
Project Description: Project consists of pavement overlay and spot base repairs and rechannelization for a protected bike lane and shared use path. Work includes milling, pavement removal, excavation, concrete and asphalt base repair, asphalt surfacing, curb ramps, sidewalks, drainage, signals, street lighting, signing, striping and landscaping. For the purpose of the Bidder Subcontractor List, this project includes rebar installation and electrical work.
Engineer's Estimate: $10,800,000
Project Location: East Marginal Way South from 1st Ave South to Tukwila City Limits.
Details
| Solicitation Number | PW#2025-057 |
| Type | Active |
| Posted | 2026-10-14 3:00AM EDT (27 days ago) |
| Response Deadline | 2026-11-18 5:00PM EST (in 7 days) |
| City | Seattle |
| State | WA |
| ZIP | 98104 |
Description
Project Description: Project consists of pavement overlay and spot base repairs and rechannelization for a protected bike lane and shared use path. Work includes milling, pavement removal, excavation, concrete and asphalt base repair, asphalt surfacing, curb ramps, sidewalks, drainage, signals, street lighting, signing, striping and landscaping. For the purpose of the Bidder Subcontractor List, this project includes rebar installation and electrical work.
Engineer's Estimate: $10,800,000
Project Location: East Marginal Way South from 1st Ave South to Tukwila City Limits.
Contact
| Name | Pamela Honma |
| Email / phone | 🔒 Available with Pro Upgrade |