SGC Power Reliability Improvements Project
Open
Bonfire
Summary
A. The Contractor shall provide all materials, equipment, labor, supervision, incidentals and all other items necessary to complete the project in accordance with the requirements of the Contract Documents. B. The Southwestern Gate Chamber (SGC) is located at the intersection of Joint Venture Way and Lubrizol Road in Louisville, KY. C. This project provides for replacing the existing feeder conductors from the Southwestern Pump Station (SWPS) to the SGC with new, larger conductors. The new conductors will be run through existing conduits in the Bells Lane duct bank under the railroad tracks. The new conductors will tie into a new Nema 4x panelboard (waterproof panel) and be split to provide separate power feeds to each of the 6 SGC gates as well as a mini-power center. A backup generator and related transfer switch dedicated to the SGC facility will also be installed. D. The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. Electrical including furnishing and installing conductors, mini-power center, panel boards, generator, transfer switch, and other equipment per the drawings and contract documents. 2. Excavation, site grading, and site restoration. 3. Fencing 4. Concrete work including construction of generator pad, sidewalk, footers, and duct bank installation. 5. Utility Locating All work shall be done in accordance to MSD's Standard Specifications.
Details
| Solicitation Number | 17437 |
| Type | ITB |
| Posted | 2026-10-13 4:30PM EDT (27 days ago) |
| Response Deadline | 2026-11-12 11:00AM EST (in 2 days) |
| State | KY |
Description
A. The Contractor shall provide all materials, equipment, labor, supervision, incidentals and all other items necessary to complete the project in accordance with the requirements of the Contract Documents. B. The Southwestern Gate Chamber (SGC) is located at the intersection of Joint Venture Way and Lubrizol Road in Louisville, KY. C. This project provides for replacing the existing feeder conductors from the Southwestern Pump Station (SWPS) to the SGC with new, larger conductors. The new conductors will be run through existing conduits in the Bells Lane duct bank under the railroad tracks. The new conductors will tie into a new Nema 4x panelboard (waterproof panel) and be split to provide separate power feeds to each of the 6 SGC gates as well as a mini-power center. A backup generator and related transfer switch dedicated to the SGC facility will also be installed. D. The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. Electrical including furnishing and installing conductors, mini-power center, panel boards, generator, transfer switch, and other equipment per the drawings and contract documents. 2. Excavation, site grading, and site restoration. 3. Fencing 4. Concrete work including construction of generator pad, sidewalk, footers, and duct bank installation. 5. Utility Locating All work shall be done in accordance to MSD's Standard Specifications.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |