KIN CP2001827 27CSP001 North Tower Rm Renovations

Agency: State of Texas Solicitation #: 27CSP001 Due: 2026-11-13 1:00AM EST (in 15 hours)
Generic-bids

Summary

This project includes 10 non-ADA Jack and Jill suites, 3 single rooms with attached bathroom, 2 accessible Jack and Jill suites with roll-in showers, 1 accessible Jack and Jill suite with a transfer shower, 1 single accessible room with attached bathroom with a roll-in shower, and 1 single accessible room with attached bathroom with a transfer shower on Level 1 at the North Tower. This project consists of the following: Demolition of flooring, walls, plumbing fixtures, wall and floor tile, doors, built-in furniture, and ceilings of 9 rooms and 5 bathrooms on Level 1 as well as doors at Rooms 158 and 160, where walls within suite were previously demolished to become fully ADA/TAS compliant accessible rooms and suites as described above. New work to include new walls, doors, plumbing re-build to tie into new chase walls, plumbing fixtures, and toilet accessories at new accessible suites as described above. All 32 rooms in scope to receive new flooring, base, paint, HVAC pony wall surround, sink and faucet in cabinet, tackboards, paint, and drywall where indicated. Power is existing and will be connected to new devices within 6’ of original location. New Lounge at North Tower Entry will be incorporated, capturing demolished resident room 152 to provide an accessible route from ground level to Level 1 resident rooms with the incorporation of a pit-free, ramp-free, electric chair lift. A small slab addition will be incorporated to infill a small area adjacent to the new chair lift location for acontinuous floor at the new Lounge 152.

Details

Solicitation Number27CSP001
Typeagency-site
Posted2026-10-12 1:00AM EDT (1 month ago)
Response Deadline2026-11-13 1:00AM EST (in 15 hours)
StateTX

Description

This project includes 10 non-ADA Jack and Jill suites, 3 single rooms with attached bathroom, 2 accessible Jack and Jill suites with roll-in showers, 1 accessible Jack and Jill suite with a transfer shower, 1 single accessible room with attached bathroom with a roll-in shower, and 1 single accessible room with attached bathroom with a transfer shower on Level 1 at the North Tower. This project consists of the following: Demolition of flooring, walls, plumbing fixtures, wall and floor tile, doors, built-in furniture, and ceilings of 9 rooms and 5 bathrooms on Level 1 as well as doors at Rooms 158 and 160, where walls within suite were previously demolished to become fully ADA/TAS compliant accessible rooms and suites as described above. New work to include new walls, doors, plumbing re-build to tie into new chase walls, plumbing fixtures, and toilet accessories at new accessible suites as described above. All 32 rooms in scope to receive new flooring, base, paint, HVAC pony wall surround, sink and faucet in cabinet, tackboards, paint, and drywall where indicated. Power is existing and will be connected to new devices within 6’ of original location. New Lounge at North Tower Entry will be incorporated, capturing demolished resident room 152 to provide an accessible route from ground level to Level 1 resident rooms with the incorporation of a pit-free, ramp-free, electric chair lift. A small slab addition will be incorporated to infill a small area adjacent to the new chair lift location for acontinuous floor at the new Lounge 152.

Contact

NameLana Beranek
Email / phone 🔒 Available with Pro Upgrade