12600 South Mountain View Corridor Sewer Project
Open
Bonfire
Summary
Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project. The Work includes installation of approximately 2,620 linear feet of 30-inch sanitary sewer pipeline, 10 sanitary sewer manholes, 225-foot-long guided bore, 81-foot-long guided bore, both with a 42-inch minimum casing crossing under Mountain View Corridor (UDOT right-of-way), landscaping and roadway restoration, and associated pertinences to construct the new sewer lines in accordance with the Contract Documents.
Details
| Solicitation Number | JBID972 |
| Type | ITB |
| Posted | 2026-10-09 2:00PM EDT (1 month ago) |
| Response Deadline | 2026-11-10 4:00PM EST (in 17 hours) |
| State | UT |
Description
Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project. The Work includes installation of approximately 2,620 linear feet of 30-inch sanitary sewer pipeline, 10 sanitary sewer manholes, 225-foot-long guided bore, 81-foot-long guided bore, both with a 42-inch minimum casing crossing under Mountain View Corridor (UDOT right-of-way), landscaping and roadway restoration, and associated pertinences to construct the new sewer lines in accordance with the Contract Documents.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ List of Prequalified Contractors.pdf Documentation
-
๐ Section 00300 - Bid.pdf Documentation
-
๐ Section 00320 - Bid Bond.pdf Documentation
-
๐ Section 00310 - Bid Schedule.pdf Documentation
-
๐ Section 00260 - Information Required of Bidder.pdf Documentation
-
๐ 12600 SOUTH MVC SPECS.pdf Documentation
-
๐ 12600 South MVC DRAWINGS.pdf Documentation