13400 South Mountain View Corridor Sewer Project
Open
Bonfire
Summary
Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project. This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 15‑inch and 8-inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch steel (0.500 inch thick) casing pipe with carrier pipe beneath Mountain View Corridor (State Route 85); trenchless installation of a 36‑inch steel (0.500 inch thick) casing pipe with carrier pipe beneath 13400 South; excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.
Details
| Solicitation Number | JBID974 |
| Type | ITB |
| Posted | 2026-10-09 2:00PM EDT (1 month ago) |
| Response Deadline | 2026-11-10 4:00PM EST (in 17 hours) |
| State | UT |
Description
Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project. This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 15‑inch and 8-inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch steel (0.500 inch thick) casing pipe with carrier pipe beneath Mountain View Corridor (State Route 85); trenchless installation of a 36‑inch steel (0.500 inch thick) casing pipe with carrier pipe beneath 13400 South; excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 Section 00300 - Bid.pdf Documentation
-
📄 Section 00260 - Information Required of Bidder.pdf Documentation
-
📄 List of Prequalified Contractors.pdf Documentation
-
📄 Section 00310 - Bid Schedule.pdf Documentation
-
📄 Section 00320 - Bid Bond.pdf Documentation
-
📄 13400 SOUTH MVC SPECS.pdf Documentation
-
📄 13400 SOUTH MVC DRAWINGS.pdf Documentation