Construction, Engineering and Inspection Services for Key Deer Blvd (North of Watson Blvd) Roadway Rehabilitation Project
Summary
The Key Deer Blvd Roadway Rehabilitation Project consists of repair and rehabilitation of the road and adjacent pedestrian path, as needed, and elevating low section of the roadway to adapt for sea level rise on the northern section of Key Deer Boulevard from Watson Boulevard to the end. to include base-work, asphalt and striping, maintenance of traffic, and signage.
Details
| Solicitation Number | RFQ-652 |
| Type | RFSQ |
| Posted | 2026-10-08 12:00AM EDT (1 month ago) |
| Response Deadline | 2026-11-24 3:00PM EST (in 13 days) |
| State | FL |
Description
The Key Deer Blvd Roadway Rehabilitation Project consists of repair and rehabilitation of the road and adjacent pedestrian path, as needed, and elevating low section of the roadway to adapt for sea level rise on the northern section of Key Deer Boulevard from Watson Boulevard to the end. to include base-work, asphalt and striping, maintenance of traffic, and signage.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |