Vallejo Ferry Terminal Reconfiguration Project

Agency: San Francisco Bay Area Water Emergency Transportation Authority Solicitation #: 25-053 Due: 2026-11-13 7:00PM EST (in 2 days)
Open Bonfire

Summary

The Vallejo Ferry Terminal Reconfiguration Project includes in-water construction and demolition, new and refurbished structures, extension and relocation of utilities, acceptance and final placement final placement of the WETA Standard Float. More specifically, the scope and extent of the improvements that are required as part of the Project are described in the Bridging Documents, which are provided in conjunction with this RFP. Project closes Nov 13, 2026 4:00 PM PST.

Details

Solicitation Number25-053
Typebonfire
Posted2026-09-28 8:00PM EDT (1 month ago)
Response Deadline2026-11-13 7:00PM EST (in 2 days)
StateCA

Description

The Vallejo Ferry Terminal Reconfiguration Project includes in-water construction and demolition, new and refurbished structures, extension and relocation of utilities, acceptance and final placement final placement of the WETA Standard Float. More specifically, the scope and extent of the improvements that are required as part of the Project are described in the Bridging Documents, which are provided in conjunction with this RFP. Project closes Nov 13, 2026 4:00 PM PST.

Contact

Email / phone 🔒 Available with Pro Upgrade