Greenville Water IFB: CIP-223 Adkins WTP High Service Pump Station Improvements
Open
Bonfire
Summary
Greenville Water (GW) is investing funds for improvements by installing an eighth pump in the High Service Pump Station at the Adkins Water Treatment Plant to maintain water treatment capacity and resiliency. The Contractor shall furnish all materials, labor, equipment, and incidentals necessary to complete the work. The work includes the installation of a High Service Pump (HSP) and its associated variable frequency drive (VFD). The pump will be provided by GW; however, the Contractor shall furnish and install the motor, baseplate, coupling, concrete pad, and all other components required to provide a complete and fully functional pumping system. The work shall also include the installation of pump suction and discharge piping, fittings, valves, and supports; removal and replacement of a ceiling exhaust fan; installation of a ceiling exhaust fan; installation of ductwork, inline exhaust fan, supports, and a louver for VFD exhaust; installation of a motor control low voltage unit (MCLU) section for the VFD; and installation of the HSP controller. Project closes Nov 10, 2026 2:00 PM EST.
Details
| Solicitation Number | CIP-223 |
| Type | bonfire |
| Posted | 2026-10-01 9:00AM EDT (1 month ago) |
| Response Deadline | 2026-11-10 2:00PM EST (in 15 hours) |
| State | US |
Description
Greenville Water (GW) is investing funds for improvements by installing an eighth pump in the High Service Pump Station at the Adkins Water Treatment Plant to maintain water treatment capacity and resiliency. The Contractor shall furnish all materials, labor, equipment, and incidentals necessary to complete the work. The work includes the installation of a High Service Pump (HSP) and its associated variable frequency drive (VFD). The pump will be provided by GW; however, the Contractor shall furnish and install the motor, baseplate, coupling, concrete pad, and all other components required to provide a complete and fully functional pumping system. The work shall also include the installation of pump suction and discharge piping, fittings, valves, and supports; removal and replacement of a ceiling exhaust fan; installation of a ceiling exhaust fan; installation of ductwork, inline exhaust fan, supports, and a louver for VFD exhaust; installation of a motor control low voltage unit (MCLU) section for the VFD; and installation of the HSP controller. Project closes Nov 10, 2026 2:00 PM EST.
Contact
| Name | Will Bettis |
| Email / phone | 🔒 Available with Pro Upgrade |