INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1)

Agency: City of North Miami Beach Location: North Miami Beach, FL Solicitation #: ITB-2026-050 Due: 2026-11-10 5:00PM EST (in 18 hours)
open Opengov

Summary

The City of North Miami Beach, FL (the "City"), is soliciting sealed responses for Project Title. Responses are to be submitted via the City's eProcurement Portal via https://procurement.opengov.com/portal/citynmb PRIOR TO Response Submission Time on Response Submission Date. Late responses will not be accepted.

Project work includes furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of the existing outfalls located adjacent to NE 25th Avenue, including, but not limited to, excavation, demolition; installation of proposed drainage structures; connection to existing storm drain system HDPE Storm Sewer (sizes vary), sleeves (sizes vary) and inline backflow prevention device; remove and relocate as required: existing 2” water services; relocate existing 8” watermain; replacement of any sod, sidewalk, pavement damaged during construction, and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation.

Details

Solicitation NumberITB-2026-050
TypeActive
Posted2026-09-30 4:25PM EDT (1 month ago)
Response Deadline2026-11-10 5:00PM EST (in 18 hours)
CityNorth Miami Beach
StateFL
ZIP33162

Description

The City of North Miami Beach, FL (the "City"), is soliciting sealed responses for Project Title. Responses are to be submitted via the City's eProcurement Portal via https://procurement.opengov.com/portal/citynmb PRIOR TO Response Submission Time on Response Submission Date. Late responses will not be accepted.

Project work includes furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of the existing outfalls located adjacent to NE 25th Avenue, including, but not limited to, excavation, demolition; installation of proposed drainage structures; connection to existing storm drain system HDPE Storm Sewer (sizes vary), sleeves (sizes vary) and inline backflow prevention device; remove and relocate as required: existing 2” water services; relocate existing 8” watermain; replacement of any sod, sidewalk, pavement damaged during construction, and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation.

Contact

NameKemesia Clarke
Email / phone 🔒 Available with Pro Upgrade